We are introduce new website where hobbyist people can buy & sell their Old and New Hobby items.

Hobbywing XRotor 40A ESC Long Lead – [OPTO]

1,859.002,299.00 (-19%)

In stock

Specially optimized firmware for disc-type motors brings the outstanding compatibility
For meeting flight requirements of multi-rotors like heavy load and long flight, we usually have to increase the motor torque and efficiency, so a lot of pilots use disc-type motors to reach those mentioned requirements. However, they overlook that the consequential compatibility issue will lead many pilots to draw back. Now our XRotor ESC’s has excellent compatibility with various disc-type motors, and this can greatly reduce the possibility of air crashes caused by “locked rotor”.

Auto Timing Adjustable & Preset Parameters for Highly Intelligent Operation
Auto timing adjustment and preset parameters applicable to most applications extremely simplify operation and optimized user experience

Special Core Program for Rapid Throttle Response
The special frame structure has made the demand over ESC response become even harsher than usual, as rapid throttle response means stable hover and swift movement. With the rapid response, Xrotor circular series ESC’s definitely can handle different challenges at ease.

Signal refresh rate up to 621Hz supported
XRotor allows the signal frequency of up to 621Hz and be perfectly compatible with various flight controls.
(Note: If refresh rate is higher than 500Hz, then ESC control signal is the non-standard throttle signal)

Driving Efficiency Optimization Technology / Great Stability & Efficiency
Driving Efficiency Technology (DEO) effectively reduces the ESC operating temperature, improves the flight time, and brings a better Throttle linearity and good stability.
With the DEO Technology the operating Temperature of the ESC can be reduced by about 20% and the operating efficiency improves by maximum 10%.

Twisted-pair throttle signal cable
The twisted-pair cable can effectively reduce the crosstalk produced in signal transmission and make the whole flight more stable.

MOSFet with super-low internal resistance
High-quality MOSFets in XRotor series ESC’s have excellent performance and great current endurance

Technical Data

  • Motor wire connectors extended on silicon wires
  • Cont./Peak Current: 40A / 60A
  • Motor Type: Sensorless Brushless Motor
  • Timing: High / Intermediate
  • Applications: Multi Rotor System with 550-650mm diameter
  • LiPo Cells: 2-6S LiPo
  • BEC Output: NO
  • Resistance: Ohm
  • Cooling Fan: No
  • Size (LxWxH): 68 x 25 x 8,7mm
  • Weight: 26g

Additional information

Weight .300 kg

Share your thoughts!

Let us know what you think...

Only logged in customers who have purchased this product may leave a review.

What others are saying

There are no contributions yet.

×

Continue as a Guest

Don't have an account? Sign Up

Main Menu

Hobbywing XRotor 40A ESC Long Lead - [OPTO]

1,859.002,299.00 (-19%)

Add to Cart