Description
Features :
Special core program for multi-rotor controllers greatly improves throttle response.
Auto Timing Adjustment and Preset Parameters for easy operation.
DEO (Driving Efficiency Optimization) technology significantly improves throttle linearity and driving efficiency.
Open Cooling Fin.
Special core program for multi-rotor controllers greatly improves throttle response.
Auto Timing Adjustment and Preset Parameters for easy operation.
DEO (Driving Efficiency Optimization) technology significantly improves throttle linearity and driving efficiency.
Open Cooling Fin.
Specification :
Output : Continuous 40A, Burst 60A up to 10 seconds
Input Voltage : 3-6cells lithium battery
BEC : NO BEC
Refresh rate of the throttle signal : up to 621Hz
Timing : High or Intermediate
Red Black cable length : 475mm
Signal cable length : 560mm
Bullet Connector : 3.5mm
Size : 73.5 x 23 x 11mm
Weight : 45g
Output : Continuous 40A, Burst 60A up to 10 seconds
Input Voltage : 3-6cells lithium battery
BEC : NO BEC
Refresh rate of the throttle signal : up to 621Hz
Timing : High or Intermediate
Red Black cable length : 475mm
Signal cable length : 560mm
Bullet Connector : 3.5mm
Size : 73.5 x 23 x 11mm
Weight : 45g
Package Includes :
2 X Hobbywing XRotor 40A Pro ESC (OPTO)
1 X English Manual
2 X Hobbywing XRotor 40A Pro ESC (OPTO)
1 X English Manual









0.0 Average Rating Rated (0 Reviews)
Only logged in customers who have purchased this product may leave a review.